S8: block exploration #6

Closed
opened 2026-10-02 00:16:05 +00:00 by jhgaylor · 1 comment
Owner

Blocks: #7, #8

Trigger: M6 has been used for about two weeks

From PLAN.md, section "S8".


This spike decides which block types come next, from evidence instead of a
list.

  • Read the friction log (docs/dogfood.md) and history for things done
    in terminals that wanted structure:
    • polling a build;
    • tailing a service's logs;
    • re-reading a diff an agent made;
    • opening a file only to read it.
  • Prototype each candidate as a throwaway type behind the M6 block
    contract: config, state, attention, capture --text, methods, log. Note
    where the contract doesn't fit.
  • Candidates:
    • job: a non-interactive command, or a hal0 or CI job;
    • service: a long-running process with restart, logs and a port, for
      example a sprite service or a dev server. It might subsume part of M6a's
      browser block;
    • file: a read-only view;
    • diff: from git diff on a host, or from an agent's edits;
    • notes: a Markdown scratchpad per tab, as a wildcard.
  • Output: a short README choosing types, and changes to the block contract
    if any. M10 and M11 below are the expected outcome, and S8 can reshape or
    drop them.
**Blocks:** #7, #8 **Trigger:** M6 has been used for about two weeks _From PLAN.md, section "S8"._ --- This spike decides which block types come next, from evidence instead of a list. - **Read the friction log** (`docs/dogfood.md`) and `history` for things done in terminals that wanted structure: - polling a build; - tailing a service's logs; - re-reading a diff an agent made; - opening a file only to read it. - **Prototype each candidate as a throwaway type** behind the M6 block contract: config, state, attention, `capture --text`, methods, log. Note where the contract doesn't fit. - **Candidates:** - **job:** a non-interactive command, or a hal0 or CI job; - **service:** a long-running process with restart, logs and a port, for example a sprite service or a dev server. It might subsume part of M6a's browser block; - **file:** a read-only view; - **diff:** from `git diff` on a host, or from an agent's edits; - **notes:** a Markdown scratchpad per tab, as a wildcard. - **Output:** a short README choosing types, and changes to the block contract if any. M10 and M11 below are the expected outcome, and S8 can reshape or drop them.
Author
Owner

Done: merged as 27a48a1 (Merge S8). spikes/s8-blocks/README.md. There is no docs/dogfood.md, so the evidence comes from git history, issue comments, the real daemon's history (read-only), shell history on geek and Claude Code transcripts, summarised as counts.
Decision: build a cut of M11 (a diff block and a file block, phone first) plus Rerun on terminals' Failed reason. M10 isn't built as block types, and there's no notes block.
Why: people ask whether work is built, merged and green; agents read the diffs and logs. Nothing lets you review what an agent changed from the phone after the fact, and M24 and M16 already cover jobs except acting on a failure from the phone.
Caveat: the trigger (two weeks of M6 use) hadn't held; this rests on one day of daily use plus how the project was built. The README says when to revisit.

Done: merged as 27a48a1 (Merge S8). spikes/s8-blocks/README.md. There is no docs/dogfood.md, so the evidence comes from git history, issue comments, the real daemon's history (read-only), shell history on geek and Claude Code transcripts, summarised as counts. **Decision:** build a cut of M11 (a diff block and a file block, phone first) plus Rerun on terminals' *Failed* reason. M10 isn't built as block types, and there's no notes block. **Why:** people ask whether work is built, merged and green; agents read the diffs and logs. Nothing lets you review what an agent changed from the phone after the fact, and M24 and M16 already cover jobs except acting on a failure from the phone. **Caveat:** the trigger (two weeks of M6 use) hadn't held; this rests on one day of daily use plus how the project was built. The README says when to revisit.
Commenting is not possible because the repository is archived.
No milestone
No project
No assignees
1 participant
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Reference
jhgaylor/illogical#6
No description provided.