M40: forge webhooks (Forgejo direct, GitHub via control's App) and hosted boxes #92

Closed
opened 2026-10-03 02:06:50 +00:00 by jhgaylor · 1 comment
Owner

Blocked by: #88 (M36); GitHub part also on the control track's GitHub App, M18 (relay) and M20 (hosted). Plan: PLAN's "Forge track", M40.


  • Forgejo: a webhook straight to the daemon over the tailnet, set up from the block (Live updates) with the person's CLI. Signatures are checked, and the block drops to slow polling while the hook is healthy.
  • GitHub: the control plane's GitHub App takes webhooks and relays them through M18 to daemons with that repo open. It also gives hosted boxes read access without a CLI login. Writes still go out as the person.
  • GitLab: webhooks to the daemon when reachable, else the relay.

Done when: a review requested on Forgejo reaches the phone within about 5 s, and a hosted box's PR block reads through the App.

**Blocked by:** #88 (M36); GitHub part also on the control track's GitHub App, M18 (relay) and M20 (hosted). **Plan:** PLAN's "Forge track", M40. --- - **Forgejo:** a webhook straight to the daemon over the tailnet, set up from the block (*Live updates*) with the person's CLI. Signatures are checked, and the block drops to slow polling while the hook is healthy. - **GitHub:** the control plane's GitHub App takes webhooks and relays them through M18 to daemons with that repo open. It also gives hosted boxes read access without a CLI login. Writes still go out as the person. - **GitLab:** webhooks to the daemon when reachable, else the relay. **Done when:** a review requested on Forgejo reaches the phone within about 5 s, and a hosted box's PR block reads through the App.
jhgaylor referenced this issue from a commit 2026-10-03 05:06:35 +00:00
Author
Owner

Built and merged into main (forge track, released in v0.8.0). PLAN has an "as built" section for this milestone, with what landed, tests and what is not covered. The part of "done when" that writes to a real forge is in #93 for Jake.

Built and merged into main (forge track, released in v0.8.0). PLAN has an "as built" section for this milestone, with what landed, tests and what is not covered. The part of "done when" that writes to a real forge is in #93 for Jake.
Commenting is not possible because the repository is archived.
No milestone
No project
No assignees
1 participant
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set

Reference
jhgaylor/illogical#92
No description provided.