M37: issue blocks, and issue → agent (worktree, agent, PR in one tab) #89

Closed
opened 2026-10-03 02:06:49 +00:00 by jhgaylor · 1 comment
Owner

Blocked by: #88 (M36). Plan: PLAN's "Forge track", M37.


  • kind: issue on the forge block: state, labels, assignees, linked PRs, the timeline. Attention when it's assigned to you or mentions you.
  • Agent on this: a worktree and branch named after the issue (iNN-<slug>), an agent block there with the issue as its prompt, and a tab holding both. The branch's PR block joins the tab when it appears.
  • illogical issue [URL | REPO#N | N], MCP open_issue, illogical issue new (an agent's is a draft ask).

Done when: on geek, Agent on this on a real issue in this repo gives a tab with the agent in its own worktree, and the PR it opens shows up in that tab.

**Blocked by:** #88 (M36). **Plan:** PLAN's "Forge track", M37. --- - `kind: issue` on the forge block: state, labels, assignees, linked PRs, the timeline. Attention when it's assigned to you or mentions you. - **Agent on this:** a worktree and branch named after the issue (`iNN-<slug>`), an agent block there with the issue as its prompt, and a tab holding both. The branch's PR block joins the tab when it appears. - `illogical issue [URL | REPO#N | N]`, MCP `open_issue`, `illogical issue new` (an agent's is a draft ask). **Done when:** on geek, *Agent on this* on a real issue in this repo gives a tab with the agent in its own worktree, and the PR it opens shows up in that tab.
Author
Owner

Built and merged into main (forge track, released in v0.8.0). PLAN has an "as built" section for this milestone, with what landed, tests and what is not covered. The part of "done when" that writes to a real forge is in #93 for Jake.

Built and merged into main (forge track, released in v0.8.0). PLAN has an "as built" section for this milestone, with what landed, tests and what is not covered. The part of "done when" that writes to a real forge is in #93 for Jake.
Commenting is not possible because the repository is archived.
No milestone
No project
No assignees
1 participant
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set

Reference
jhgaylor/illogical#89
No description provided.